Featured Mumbai-Ahmedabad bullet train B28 designed for 249 kmph operations The eight-coach train is being built in Bengaluru and is designed to carry around 557 passengers. The corridor’s priority section is targeted to open by August 2027. Staff Reporter 02/11/2026 20:40