Oshiwara’s Mogra Nala Bridge to close until May 2027 for rebuilding

The bridge linking SAB TV Road and New Link Road will be shut to all vehicles in both directions while the BMC demolishes and rebuilds it.

Oshiwara’s Mogra Nala Bridge to close until May 2027 for rebuilding – Mumbai Keith Lobo

Oshiwara’s Mogra Nala Bridge will be closed to vehicles in both directions until May 31, 2027, as the Brihanmumbai Municipal Corporation demolishes and rebuilds the structure. The bridge links SAB TV Road with New Link Road, making the closure relevant to people travelling through Oshiwara and the wider Andheri area.

The existing bridge has become dilapidated, according to the traffic notification. The BMC’s K/East Ward will carry out the reconstruction at the same site. The closure applies to vehicles of all types; the announcement does not state when the shutdown will begin.

What the traffic notification says

Deputy Commissioner of Police (Traffic, Western Suburbs) Ajit Borhade’s notification sets out alternative routes for light vehicles. The road-by-road alternatives are not specified in the announcement details, so drivers should check the traffic police’s directions before setting out. The bridge itself will remain shut in both directions for the reconstruction period.

The bridge is also described as being on Pramod Navalkar Marg. With the connection between SAB TV Road and New Link Road unavailable, local trips may need to use other roads. A commuter from Versova-Yari Road, Asad Lakshariya, said he expected to take a longer route via Versova and feared losing time on journeys by two-wheeler and car.

Residents’ concerns about congestion

Residents and commuters have raised concerns that the closure could worsen congestion in Andheri, where they say traffic is already a problem. Advocate Sandeep Pandey called for the BMC and traffic police to announce clear alternative routes jointly and urged authorities to remove illegal parking and encroachments near the bridge.

Fish trader Rajendra Patil, who lives in Versova village, also warned of traffic problems for residents and commuters. He called for illegal hawkers and encroachments occupying roads to be removed, saying that freeing road space would make travel easier. The announcement does not give a completion schedule beyond the stated closure end date of May 31, 2027.

This report draws on information from Free Press Journal.

Editorial checks passed Facts, figures and quotes checked against 2 sources

Add Mumbai News as a preferred source on Google

Related stories