Mumbai coast hoarding plan: Rane says only two new structures proposed

Maharashtra minister Nitesh Rane says a tender refers to two existing floating hoardings near the Bandra-Worli Sea Link and two proposed additions, not 20 new installations.

Mumbai coast hoarding plan: Rane says only two new structures proposed Abhishek Biradar

Mumbai’s proposed floating hoardings are limited to two new structures, Maharashtra Fisheries and Ports Development Minister Nitesh Rane said on Friday, rejecting claims that 20 would be installed along the coast. The distinction matters to residents and visitors concerned about commercial advertising in coastal waters and its effect on waterfront views.

Rane said a Maharashtra Maritime Board (MMB) tender had been misunderstood. He said it covered four hoardings in total: two existing structures near the Bandra-Worli Sea Link and two proposed installations. He also said he would not support an initiative that compromised Mumbai’s marine environment or obstructed its waterfront views.

What the proposal covers

The MMB, which operates under Rane’s department, floated the tender at the centre of the clarification. In a post on X, the minister described the claim that 20 hoardings would be put up in the sea as false and misleading. He urged people not to politicise the issue and said the government was willing to engage with anyone seeking clarification.

The dispute had also drawn a response from Shiv Sena (UBT) leader Aaditya Thackeray, who wrote to Chief Minister Devendra Fadnavis seeking intervention. Thackeray called the move to permit floating hoardings irresponsible and warned it could damage the city’s aesthetics.

What remains unclear

Rane’s clarification does not identify where the two new hoardings would be placed. It also gives no details of their size, design or operating terms, or whether the required approvals have been granted. Locations including Juhu Beach, Carter Road and Marve Jetty had been mentioned in media coverage, but Rane’s statement did not confirm them as sites for the proposed structures.

The tender’s financial terms, environmental and navigational clearances, and the next steps in the process have not been announced in the minister’s statement. The MMB and state government have not set out a separate public disclosure or timeline in the available information. Rane said relevant details would be shared transparently with those seeking clarification.

This report draws on information from Free Press Journal and Urban Acres.

Editorial checks passed Facts, figures and quotes checked against 2 sources

Add Mumbai News as a preferred source on Google

Related stories