Bandra Terminus Platform 5 to close for 75 days from December 1
Western Railway says the repairs will disrupt long-distance train terminals and cause delays and cancellations on some suburban services until February 13.

Bandra Terminus in Mumbai will close Platform 5 from December 1 for 75 days of repair work, disrupting long-distance trains and some suburban services until February 13, 2027. Western Railway (WR) says trains will be diverted, moved to other terminals or short-terminated during the work.
The closure is expected to affect passengers using Bandra Terminus and commuters on local trains. WR says suburban services could be delayed by up to 10 minutes; four local services are set to be cancelled throughout the block. The railway has not said whether further local cancellations will be needed.
The repairs will involve removing the existing tracks and concrete apron, then rebuilding the platform foundation in phases. A WR official said the base had sagged in places, requiring trains to slow down and contributing to delays of about 20–30 minutes during peak hours.
Which trains will change or be cancelled?
Four local services are scheduled to be cancelled: Churchgate–Borivali fast local BO90559 at 2.50pm; Borivali–Churchgate slow local BO90596 at 3.40pm; Churchgate–Borivali fast local BO94105 at 5.28pm; and Borivali–Churchgate fast local BO94110 at 6.24pm.
The Bhuj–Bandra Terminus service (22956/22955) will run from Dadar instead. The Ajmer, Sri Ganganagar and Bhagat Ki Kothi services listed by WR will run from Bandra Terminus rather than Dadar. Five incoming long-distance trains will end at Borivali without continuing to Bandra Terminus, while four outgoing services will start from Borivali.
How long will the work last?
The block is due to run from December 1 to February 13, 2027. Some long-distance services will be short-terminated at Borivali or shifted between Bandra Terminus and Dadar; passengers should check their train’s departure or arrival station before travelling. WR has not provided further details on possible additional suburban cancellations.
This report draws on information from Free Press Journal.
Editorial checks passed Facts, figures and quotes checked against 1 source

Add Mumbai News as a preferred source on Google



